Wednesday, May 5, 2010

It's Laker deja whew in 111-103 victory over Utah Jazz

Any way to change this to a best-of-five series?
The Lakers continued to get the best of the Utah Jazz, turning a Western Conference rivalry into a playground version of sixth-graders against fourth-graders, the latest after-school scuffle transitioning into a 111-103 victory Tuesday at Staples Center.
It wasn't easy -- nothing seems to be for the Lakers in these playoffs -- but they took a 2-0 lead over the Jazz in the conference semifinals.
The numbers are getting overwhelming, the Lakers now two victories from eliminating the Jazz for a third consecutive season while moving to 20-6 against Utah over the last few years, including playoffs.
Receive breaking news alerts on your mobile device. Register »
Andrew Bynum and Lamar Odom brushed off recent injuries on the way to double-doubles, and Kobe Bryant almost had one too, but before the Lakers pat themselves on the back, they have plenty to study before Game 3 on Saturday in Utah.They gave away most of a 15-point lead, committed 20 turnovers, made four of 17 three-point attempts (23.5%) and failed to coast despite double-doubles by three players.
Only when Odom found Ron Artest with a long lead pass for a dunk could Lakers fans begin celebrating in earnest, their team ahead by eight with 28.3 seconds to play.
"Somehow, we managed to win that game," Lakers Coach Phil Jackson said, sighing a couple of times at his postgame news conference.
Then again, the Lakers have won 16 consecutive games against the Jazz at Staples Center. The outcome might be the next thing to a foregone conclusion.
Bynum had a double-double in the first half and finished with 17 points and 14 rebounds despite playing with a slight cartilage tear in his right knee.
Odom ignored a slightly sprained right knee and ended his string of mostly unremarkable playoff games with 11 points and 15 rebounds.
"It's still a little swollen," Bynum said of his knee. "But I have three nice rest days."
Bryant finished with 30 points and eight assists, almost joining Bynum, Odom and Pau Gasol (22 points, 15 rebounds) in double-double territory.
Utah again went without two starters -- center Mehmet Okur and forward Andrei Kirilenko -- but the Lakers again couldn't extend a lead. They led by 15 early in the third quarter, but it was trimmed to 98-94 on a layup by C.J. Miles with 5:01 to play.
Bryant took over from there, making a long two-pointer to beat the shot clock, and quickly following it with a reverse dunk to put the Lakers ahead, 107-96, with 2:07 to play.
The first half was all about Bynum, who had 11 points and 13 rebounds as the Lakers took a 58-46 lead.
On one play, he elevated over Kyrylo Fesenko for a dunk and, instead of wincing, looked to see if a foul would be called, raising his arms.
In other words, he seemed just fine.
"We had some great play tonight from our big guys," Jackson said.
The problem was the Lakers' second-half defense ... and their turnovers.
The Jazz outscored the Lakers after halftime, 57-53, forcing them into 11 turnovers. Bryant finished with seven, Gasol had six.
"If we're not smart with the basketball, we turn the basketball over, they get run-outs, so they think they have the opportunity to beat us," Bynum said.
It's just enough to give the Lakers something to do during their long pause between Games 2 and 3.
Extending their dominance over the Jazz might take some extra work.apple
brave
tiger
honest
perseverehttp://www.worldwar.be/forum
http://www.comicsbulletin.com/forum
http://www.powerbookmedic.com/forum
http://www.msweb.nl/forum
http://infokolej.pl

specializing Marketing Communication-Brand Management

I have my master and bachelor degree in International Communication management, specializing Marketing Communication-Brand Management.chi pink dazzle chi pink dazzleIn addition, I completed an internship focusing on new product development for the publisher of Elle magazine-chi hair straightener-HFM and a Sales and Management training in USA. chi hair straightener I'm adaptable, cheap polo shirtscheap polo shirtsanalytical, cooperative, creative, candid,efficient,independent. I'm a good planner and team worker, responsible and able to meet deadlines and work under pressure.
http://truemirror.informe.com
http://forums.fuxinsoftware.com.cn
http://volvoforums.com/forum
http://masterrussian.net/mforum
http://www.tarnowo-podgorne.info



I have been working in a furniture company since I am jackaroo

I have worked at elelectrical appliance firm for more than ten years and accumulated abundance of working experience.cheap men's nike shoescheap men's nike shoes I am very familiar with developing situation of whole trads. The most advantage is continuous challenge myself.cheap womens nike shoes I will continue to improve many abilities by innovation,cheap womens nike shoesI will create many fortune by using today knowledge in the future. Diligence is one of my many outstanding my major is English, and like to do any job that is about English. my second language is Japanese.cheap nike shoes I have been working in a furniture company since I am jackaroo. I am as exporting sales in the exporting department. cheap nike shoes my major job is to communicate with foreign customer, arranging the shippment, and get the transfer back.http://www.alyaseer.net/vb
http://www.php.ru/forum
http://www.experiencefestival.com/forum
http://basketball.victorysportsnetwork.com/messageboard
http://forums.alfresco.com/fr




Tuesday, April 27, 2010

Competition is Beneficial

Competition is just like the fuel of the rocket. Without it we can’t make progress. Without it we wouldn’t take our efforts in doing everything. Competition is the propeller of our daily lives. Due to it we must try our best to do something, or we would lag behind. So competition is beneficial. This is why the society is rapidly making progress. The whole society is a competition, while all the members of society are competitor. One man who wants to receive a good job must do better than others. If not, he would be eliminated. This is the reason that the work is done better and better. Competition spread through our daily lives. As a student, we must try our best to study that can we have bright future. As an employer in the company, we must work to the best of our ability. If not, we may fall behind or lose job. Although we may lose in the competition encounters, we may regard the failure as a challenge. From it we may get more experience which would be a key of success. Therefore, competition is beneficial. Competition can inspire all the competitors. From the competition, we can receive the experience, no matter what the result is, win or lose.
http://www.mikafanclub.com/forums
http://www.socnet.com
http://foros.gxzone.com
http://www.ukgser.com/forums
http://www.kaysaronline.com
only the world
Obey your thirst
We lead.Others copy
Impossible made possible
Take time to indulge

communications technology


The thesis fully affirmed this wireless communications technology in automation of power system feasibility and broadening application prospects through analyzing and studying the GPRS / CDMA structure and characteristics.The thesis focused on analyzing new wedding dresses and researching the choice of Network scheme and internet access options of GPRS / CDMA wireless communications technology which applied in the power load management;and put forward a way which Combined the GPRS / CDMA and Virtual Private Network (VPN) technology to Constructe the Network,and select the cheap evening dresses way of MCU + GPRS / CDMA module which is embedded TCP / IP protocol stack to access the internet. The article also researched the security issues of the GPRS / CDMA network ,and proposed several well-established network security measures for load discount wedding gowns management system.At last,the paper used the GPRS module MC55 and CDMA module DTL-800 as examples,introduced the application of GPRS and CDMA wireless communication technology respectively in the power load management system designs which include the wireless communication module and load management terminal interface hardware design, hardware anti-interference cheap shoes blog 2010 measures, prevent the wireless link dropped to maintain the link real-time online,wireless software design for data transmission custom made prom dresses and the using of SMS function to modify the design parameters of the load terminals.
http://www.onlive1.com/
http://forum.majidonline.com/
http://forum.theshiponline.com/
http://www.whoslocked.com/forums
http://discussions.texasbowhunter.com/forums
Where will life take you?
A journey is not a trip
A Discovery
a process of self-discovery
face to face with ourselves

Ericsson

A representative to take charge of Customer_Service and Quality section in north China in order to understand customer’s need, meet their requirement, finally satisfy customer.  Customer service and Product supporting for customers in ShangHai or custom made prom dresses nearby cities , such as Ericsson, HPQ, Dell, Siemens, Sony, etc in order to expand business opportunity in Mainland China.
http://www.webmaster-forums101.com
http://www.guitars101.com/forums
http://www.g3twarez.com
http://wsouk.com/enforum
http://forum.tak-va.com
Representative of Quality in USA for all ASTEC Power-Supply products to Dell company. Understanding and meeting customer’s wants; Coordinating in Product Service Groups for Dell; Reporting to ASTEC Quality VP directly.  Participate in New-Product-Development 12hot cheap prom dresses stage as a program coordinator for robust design with procedures similar as APQP/PPAP in TS16949. Work closely with Dell Global Commodity/ Procurement Manager in USA Participate business project in order to expand business with Dell. Hold responsibility for W.W. Product chi flat iron store Quality issues & overall Quality improvement / Business-Process Improvement Project. Work with Marketing/sales staffs to look for new business opportunity; Led the team for continuous plus size wedding dresses improvement by lean 6 sigma projects and new-product trial run with QAV and wedding gowns dresses method.  Worked in various depts with operating management experience - production/ material planning & Post_Design_Service dept before transferred to Quality Dept - familiar with overall process management from purchasing / material planning to FG shipment, including production/material planning, cost control, delivery control, subcontractor/supplier qualification / management purchasing management, etc.
I am not a smart man,but I know what is love.
tomorrow is another day
silence hill
never take our Freedom
celebrate our independence day

Production process optimization

take charge of supply-chain operating/Quality functions (managing contracted manufacturer,Quality management, sourcing, planning, Production process optimization, cost, technical support ) in China, including: * Define and recommend the operational objective based on company’s strategy in China supply-Chain.* Set-up and monitor the appropriated chi flat iron system to ensure the operations meet the org. performance plans with quality control. * Quality management on suppliers in supply chain.* Operation management on contracted-manufacturer such as hair straighteners Solectron, Flextronics, etc.* Supplier management including outsourcing, qualification, managing/monitoring supplier performance/ business terms * Project management in cheap ralph lauren polo shirts projects.* Production, Planning/scheduling, process setup & improvement in order to ensure the chi dazzle high-quality, on-time delivery;
http://agriviet.com/home
http://www.straightrazorplace.com/forums
http://www.spellforce.com/forum
http://www.blackhatteam.com
http://www.d4arab.com/forum
Taking charge of all quality functions in Asia including 5 factories in China and 2 factories abroad, covering supplier qualification/management, customer service/relationship in Asia. Main products are air-conditioner, compressor, air-cleaning discount wedding dresses products with paper filter or electric-filter, ion generator, humidifier, dehumidifier. * Quality system establishment and audit.* Quality Strategy, fulfillment.* Quality assurance of Product cheap evening dresses design quality* Optimized Supplier management system – the scorecard system to overall measure integrated supplier performance through its quality/management system, JIT delivery, cooperation, product quality, reaction to issue, cost, process ability, audit result & etc. * Liaise with other relevant departments to solve product quality issue and quality system issue.* TQM management, continuous improvement and 6 sigma projects.
shines down to us
Greater too than you can describe
undeniable
this world is not merely a bad joke
meaningless